EFA Success Rates

The EFA Success Rates report shows the success rates for EFA qualifications.

Please note that there is currently no official specification for EFA success rates. As such, this report should be considered our interpretation of how EFA success rates work.

Parameters

Layout

The report shows the completion, achievement and pass rates by three groupings, contract year and contract period. The year in which results fall is based on the hybrid end date, which is the latest out of the planned end date and the actual end date (there is an exception to this with certain work placements, which is detailed above). Without forecasting, the results only include aims which have an actual end date. Each cell consists of 3 figures, which depend on the success rate type chosen in the parameters:

Aims planned to end in the year which were completed at any time

Completion Rate

Achievement Rate

Pass Rate

Aims planned to end in the year which were completed during that year

Completion Rate

Achievement Rate

Pass Rate

The report only includes aims which completed their qualifying period. The qualifying period is defined as follows:

For aims in 2015/16 or later

Planned hours in-year Study programme planned length in-year Qualifying period
0 to 449 >= 24 weeks 6 weeks (42 days)
0 to 449 2 to 24 weeks 2 weeks (14 days)
450+ N/A 6 weeks (42 days)

For aims in 2014/15 or earlier

Study programme planned length in-year Qualifying period
>= 24 weeks 6 weeks (42 days)
2 to 24 weeks 2 weeks (14 days)

The report also excludes aims with an aim reference of CMISC001, XESF0001, ZFLW0001, ZINN0001, ZINN0002, ZINN0003, ZINN0004, ZINN0005 or ZINN0006.

Clicking on the left or right figures will show a drilldown of the relevant aims, grouped by learner.

Forecasting

The Forecast parameter allows you to choose three views of the data:

Work Placements

Work placement aims (i.e. aims where the aim reference begins with Z000783, such as Z0007835, Z0007836, etc) are handled specially in this report when they are restarted in a new contract year. If a work placement aim continues past 31st July, the aim is closed with a completion status of 3 (withdrawal) and is restarted on 1st August as a new aim. The planned hours for the original and restarted aim are adjusted accordingly.

Since the above scenario would result in the original aim being recorded as a withdrawal (as per the funding guidance), even if the planned hours were completed in-year as planned, the report treats the original aim as if it had a completion status of 2 instead.

Additionally, there is a parameter which allows you to choose whether the cohort year of the original aim should be based on the hybrid end date or only the actual end date (see the parameters section for details).

The original aim for a restarted work placement is identified as follows: